Process improvement projects, proven before rollout
Every project here followed the same path. Map the process, run a real simulation, find the constraint with bottleneck analysis, and prove the fix before changing the real operation. The numbers are what teams actually delivered.
- 12%of ICU emergencies were being turned away
- 50%+shorter door-to-discharge time
- 25%more lives saved through optimized triage, in a modeling study
- +13.85%more output, worth $2.1M a year
- $700Ksaw purchase avoided
- +19%more throughput, at almost no cost
- 7%how close the model ran to the real line
- $600Kinventory cut across six plants
- 96%of calls answered, up from 85 percent, at ten times the volume
- $64Msaved immediately, and about $190M over time
- 57%growth in the consulting unit, absorbed by the support center
- $133Ma year in SG&A, the three-year reduction target the model supports
- 50%cycle-time improvement, the two-year goal simulation was used to reach
- 15%more revenue from optimizing the table mix
- 58%faster application turnaround under a new pod model
- 87%shorter sales cycle
- $40.5Mcapital expansion avoided
- $4Msaved a year, at the same mail volume
- $50K+capital spend avoided
- $40Mexpenditure avoided
- 50%fewer hydrants, full capability kept
- 90-95%department utilization, up from 30-35%
- 150/daytrailer-load quota met, $100K/day penalties avoided
Case studies
Every project, filterable by industry
Showing all 33 projects
Healthcare8 to 12 hrsmedication-order delay the project set out to cut
Cutting a medication-order delay that ran up to twelve hours
A hospital
Read the project
Healthcare12%of ICU emergencies were being turned away
Recovering ICU capacity that turned away one in eight emergencies
A Level I trauma center
Read the project
Healthcare50%+shorter door-to-discharge time
Cutting emergency door-to-discharge time by more than half
An emergency department
Read the project
Healthcare25%more lives saved through optimized triage, in a modeling study
Research modeling shows triage optimization saving 25 percent more lives
A peer-reviewed pandemic-response modeling study
Read the project
Healthcare+13.85%more output, worth $2.1M a year
Lifting medical-device output by 13.85 percent without a new line
A medical-device manufacturer
Read the project
Healthcare2xoutput, from 2 to 4 billion units
Delivering a record-breaking pharmaceutical launch
A pharmaceutical manufacturer
Read the project
Manufacturing$700Ksaw purchase avoided
Avoiding a $700,000 saw the line did not need
A window manufacturer
Read the project
Manufacturing+19%more throughput, at almost no cost
Lifting export throughput 19 percent for pennies
A vehicle export processing center
Read the project
Manufacturing7%how close the model ran to the real line
A variable assembly line modeled within 7 percent
An electronics assembly operation
Read the project
ManufacturingOn timedelivery across 20 to 30 simultaneous customer orders
Bringing order to high-stakes casting delivery
A multibillion-dollar aerospace and medical castings producer
Read the project
Manufacturing$600Kinventory cut across six plants
Right-sizing kanbans across six plants
An office-furniture manufacturer with six plants
Read the project
Services10,000garments a week on an 8-hour day, up from 6,600 on a 14-hour day
More garments out the door on a shorter working day
Hangers, Inc.
Read the project
Services96%of calls answered, up from 85 percent, at ten times the volume
From 400 calls a day to 4,000, answered better
A large financial services company
Read the project
Services$64Msaved immediately, and about $190M over time
An ad-sales overhaul that started with a new-hire paper trail
A sports channel
Read the project
Services8 weeksper project, to model and reshape a service flow
Treating service orders the way a factory treats parts
A telecommunications company
Read the project
Services57%growth in the consulting unit, absorbed by the support center
Absorbing 57 percent growth by moving work to the web
A consulting firm
Read the project
Services$133Ma year in SG&A, the three-year reduction target the model supports
Mapping the value stream toward a large cost-reduction goal
An office-furniture manufacturer
Read the project
ServicesMillionsin patent value protected by closing a statutory-bar risk
Protecting patents by modeling the legal process
An aerospace and rocket-motor company
Read the project
Services50%cycle-time improvement, the two-year goal simulation was used to reach
Teaching a whole workforce to see the process
An imaging company
Read the project
Services22 dayscut from a 155-day cycle, with utilization above 95 percent
Twenty-two days out of a printed-communications workflow
A consulting firm
Read the project
Services15%more revenue from optimizing the table mix
More revenue from the same room, with fewer seats
A restaurant
Read the project
Services45 to 60 daysloan cycle, the starting point on the way toward one-day approval
Driving loan approvals from weeks toward a single day
A mortgage lender
Read the project
Services58%faster application turnaround under a new pod model
A pod model that cut application turnaround by more than half
An auto finance company
Read the project
Logistics87%shorter sales cycle
Cutting a nine-month sales cycle to 35 days
A maker of reflective, high-visibility safety garments
Read the project
Logistics$40.5Mcapital expansion avoided
Avoiding a $40.5M plant expansion
A road-paving equipment manufacturer with more than 30 years in business, building machines 45 to 60 feet long and weighing 50,000 to 100,000 pounds
Read the project
Government$4Msaved a year, at the same mail volume
Halving the work cells across 20 mail plants
A national postal service
Read the project
Military and defense$50K+capital spend avoided
Proving a grenade-line change before a $50,000 spend
American Ordnance, a military ammunition manufacturer (M430 40mm grenade line)
Read the project
Military and defense$40Mexpenditure avoided
Avoiding a $40M system that would not have helped
A US military biometrics group analyzing IED-incident evidence
Read the project
Military and defense50%fewer hydrants, full capability kept
Keeping a base fueled through a 50% hydrant cut
A US Air Force base, a bomber operating location and transport-refueling hub
Read the project
Military and defense3 fleetsA-10, C-130, and F-16 depot maintenance, modeled as one system
Modeling depot maintenance across three fighter fleets
Ogden Air Logistics Center, Aircraft Directorate (2,200+ staff)
Read the project
Military and defense90-95%department utilization, up from 30-35%
Lifting a VA department from 30% to 90% utilization
The Veterans Administration Customer Accounts Center (seven VA hospitals across Tennessee, Kentucky, and West Virginia)
Read the project
Military and defense150/daytrailer-load quota met, $100K/day penalties avoided
Meeting a 150-load-a-day nuclear-cleanup quota
The DCS consortium (Duke Energy, COGEMA, Stone & Webster) at a mixed-oxide nuclear-fuel facility
Read the project
Military and defenseWait vs costtraining time balanced against seat-utilization cost
Balancing Navy training time against cost
The US Navy, Chief of Naval Education and Training
Read the projectTrusted by teams at leading organizations
See your process clearly, then prove the fix
Build the model, run the simulation, find the constraint, and show the improvement before you change a thing.






















